name: delivery-factory description: Use when the user wants to produce all deliverables for an SAP Activate phase in one orchestrated run. This is the factory — it chains skills, dispatches agents in parallel, collects artifacts, and produces a phase-complete deliverable package with quality scoring.

SAP Delivery Factory

This skill orchestrates the production of all deliverables for an SAP Activate phase in a single coordinated run. It is not a skill — it is a factory that invokes skills, manages their inputs/outputs, tracks deliverable status, and scores quality.

What makes this different: Individual skills produce individual artifacts. The factory produces a complete, cross-referenced, quality-scored deliverable package — what a consulting firm bills $50K-$500K to create manually.

Iron Laws

  1. EVERY PHASE HAS A MANDATORY DELIVERABLE SET. You cannot mark a phase complete with missing deliverables. The factory knows exactly what each phase requires — no cherry-picking, no "we'll do that later."

  2. DELIVERABLES CHAIN — OUTPUT OF ONE IS INPUT TO THE NEXT. The project charter feeds estimation. Estimation feeds architecture. Architecture feeds development. The factory manages these dependencies automatically.

  3. QUALITY IS SCORED, NOT ASSUMED. Every deliverable gets a maturity score (L1-L5). The factory reports aggregate quality per phase. You ship when quality meets the threshold — not when you run out of time.

  4. CONTEXT FLOWS ACROSS SKILLS. Industry, country, SAP version, project scope — set once, applied everywhere. A retail project in Germany gets different templates than a pharma project in India.

  5. THE FACTORY NEVER PRODUCES EMPTY TEMPLATES. Templates pre-filled with project context, industry defaults, country-specific regulatory items, and SAP version-appropriate recommendations. The consultant refines — they don't start from blank.

Phase Pipelines

DISCOVER Phase

Command: /sap-deliver discover Duration: 1-2 weeks equivalent Deliverables produced:

# Deliverable Skill Invoked Agents Dispatched
D1 Project Charter project-kickoff
D2 Stakeholder Map & RACI project-kickoff
D3 Requirements Document deep-interview
D4 Risk Register (initial) project-kickoff
D5 High-Level Scope brainstorming sap-architect

Dependency chain: D1 → D2 → D3 → D4 → D5 Phase gate: All 5 deliverables at L2+ quality. Stakeholder sign-off on scope.

PREPARE Phase

Command: /sap-deliver prepare Prerequisites: DISCOVER phase complete Deliverables produced:

# Deliverable Skill Invoked Agents Dispatched
P1 Effort Estimate (WBS) estimation sap-estimator
P2 Solution Architecture solution-architecture sap-architect
P3 Change Management Plan change-management
P4 Business Case / ROI value-advisory sap-value-calculator
P5 Project Plan (timeline) estimation

Dependency chain: P1 ∥ P2 (parallel) → P3 → P4 → P5 Phase gate: All 5 deliverables at L3+ quality. Budget approved.

EXPLORE Phase

Command: /sap-deliver explore Prerequisites: PREPARE phase complete Deliverables produced:

# Deliverable Skill Invoked Agents Dispatched
E1 Fit/Gap Analysis Matrix fit-gap-analysis Module consultants (parallel)
E2 Process Design Documents (per module) process-design sap-process-modeler
E3 Functional Specifications deep-interview + module skills sap-doc-generator
E4 Data Migration Strategy data-migration sap-data-analyst
E5 Test Strategy testing-strategy sap-test-designer
E6 Integration Architecture solution-architecture sap-architect

Dependency chain: E1 → E2 → E3, and E4 ∥ E5 ∥ E6 (parallel) Phase gate: All gaps resolved or accepted. Functional specs signed off.

REALIZE Phase

Command: /sap-deliver realize Prerequisites: EXPLORE phase complete Deliverables produced:

# Deliverable Skill Invoked Agents Dispatched
R1 Technical Specifications program-to-spec or code-generation sap-doc-generator
R2 Developed Objects (code) autopilot Full team (parallel)
R3 Unit Test Results self-correcting-loop sap-test-designer
R4 Code Review Reports code-review sap-reviewer, sap-security-auditor
R5 SIT Test Scripts & Results testing-strategy sap-test-designer
R6 Training Materials module skills sap-doc-generator

Dependency chain: R1 → R2 → R3 → R4 → R5 ∥ R6 Phase gate: All code ATC-clean. SIT passed. Training materials reviewed.

DEPLOY Phase

Command: /sap-deliver deploy Prerequisites: REALIZE phase complete Deliverables produced:

# Deliverable Skill Invoked Agents Dispatched
Y1 Data Migration Plan & Results data-migration sap-data-analyst
Y2 Cutover Runbook cutover-planning
Y3 Go-Live Readiness Assessment go-live-readiness Full team (parallel)
Y4 UAT Results & Sign-Off testing-strategy sap-test-designer
Y5 Transport Release Log transport-release

Dependency chain: Y1 → Y2 → Y4 → Y3 → Y5 Phase gate: Go/No-Go decision GREEN. All transports imported.

RUN Phase

Command: /sap-deliver run Prerequisites: DEPLOY phase complete Deliverables produced:

# Deliverable Skill Invoked Agents Dispatched
N1 Hypercare Plan hypercare
N2 Daily Status Reports hypercare
N3 Value Realization Report value-advisory sap-value-calculator
N4 Lessons Learned hypercare
N5 Knowledge Transfer Log hypercare sap-doc-generator

Phase gate: Hypercare exit criteria met. Knowledge transferred.

Quality Scoring

Every deliverable is scored on a 5-level maturity model:

Level Name Definition Evidence
L1 Draft Structure created, sections identified, placeholders present File exists with correct structure
L2 Working Content filled for all sections, no placeholders remaining All sections have substantive content
L3 Reviewed Peer reviewed, gaps identified and resolved Review comments addressed
L4 Approved Client/stakeholder sign-off ready Meets all hard gate criteria
L5 Baselined Signed off, version-controlled, change-managed Sign-off record exists

Phase completion thresholds:

  • DISCOVER: All deliverables at L2+
  • PREPARE: All deliverables at L3+
  • EXPLORE: All deliverables at L3+
  • REALIZE: All deliverables at L4+
  • DEPLOY: All deliverables at L4+
  • RUN: All deliverables at L3+

Context Injection

The factory injects project context into every deliverable:

PROJECT CONTEXT (set once, used everywhere)
═══════════════════════════════════════════
Client:       [Client name]
Project:      [Project name]
SAP Version:  [From .sap-superpowers/config.json]
ABAP Release: [From config]
Industry:     [Loads industry/{name}.md]
Country:      [Loads country/{name}.md]
Modules:      [In-scope SAP modules]
Timeline:     [Project start → go-live]
Team Size:    [Number of consultants]

Industry context auto-populates:

  • Module-specific processes relevant to the industry
  • Regulatory requirements for the country
  • Common customizations for the industry
  • Risk patterns typical for the industry/country combination

Factory Status Report

SAP DELIVERY FACTORY — PROJECT STATUS
═══════════════════════════════════════
Project: [Name] | Client: [Name]
Industry: [Name] | Country: [Name]
SAP: [Version] | Release: [ABAP release]

PHASE STATUS
────────────
[✅] DISCOVER  — 5/5 deliverables (avg L3.2)
[✅] PREPARE   — 5/5 deliverables (avg L3.8)
[🔄] EXPLORE   — 3/6 deliverables (avg L2.5)  ← CURRENT
[ ] REALIZE   — 0/6 deliverables
[ ] DEPLOY    — 0/5 deliverables
[ ] RUN       — 0/5 deliverables

DELIVERABLE DETAIL (EXPLORE)
────────────────────────────
[L3 ✅] E1 Fit/Gap Matrix
[L3 ✅] E2 Process Designs (MM, SD, FI)
[L2 🔄] E3 Functional Specifications — 4/7 modules complete
[L1 ⏳] E4 Data Migration Strategy — draft started
[ ] E5 Test Strategy
[ ] E6 Integration Architecture

NEXT ACTION: Complete E3 (functional specs for PP, PM, QM)

Verification

This skill is complete when:

  • All deliverables for the target phase are produced
  • Each deliverable meets the phase quality threshold
  • Cross-references between deliverables are consistent
  • Factory status report produced
  • Next phase prerequisites documented

Cross-References

  • Every skill in skills/consulting/ and skills/delivery/ — invoked by the factory
  • Every agent in agents/ — dispatched by the factory
  • industry/ files — loaded for context injection
  • country/ files — loaded for regulatory context
  • accelerators/ — pre-built solution packages that fast-track specific phases